To connect the SAS to operate about the cable, you squeeze the cables towards the riser until finally the cam posts closest to the cables rotate plenty of to accept the SAS string loops. After it’s related, There exists now enough slack to get rid of the cables. Very simple, https://archery-supply.com/product/mathew-v3x-fully-loaded/