Eskom has correctly synchronised Unit 2 with the Koeberg Nuclear Power Station in Cape Town, towards the nationwide grid. The unit was synchronised into the national grid, marking a major milestone during the Generation Operational Recovery Plan and South Africa’s pursuit of a reliable, cost-powerful, and environmentally sustainable power https://sassastatuscheckforr35069146.mpeblog.com/56816509/eskom-synchronises-koeberg-s-unit-two-for-the-grid