Scheduling is part of the decision. An urgent fault and a planned upgrade should not be written as if they take the same slot.
A useful page about Jimsexcelauto names the job, the constraint, and what a reader should https://jimsexcelauto244482.isblog.net/comparing-options-for-auto-repair-in-bechtelsville-pa-vs-alternatives-61076313